The Lindero Canyon Road Bridge Improvements project is the third component of a three phase improvement plan to improve circulation and reduce traffic congestion along the Lindero Canyon Road corridor. The interchange is an important link for motorists to access commercial, industrial, and residential areas on both sides of the freeway. This project primarily modifies the existing bridge overpass at Lindero Canyon Road and Highway 101, and the approaching roadway. These modifications will include: removal of the existing center median; addition of a travel lane in each direction; removal and replacement of the existing exterior barriers with aesthetic treatments; northbound Lindero Canyon Road on-ramp median modification; and related grading, drainage, utility and traffic signal improvements.
The City of Westlake Village chose MNS to provide construction management services for this project.